{"database": "press", "table": "releases", "rows": [["https://pingree.house.gov/media-center/press-releases/collins-king-pingree-call-army-corps-engineers-fund-york-harbor-saco", "Collins, King, Pingree Call on Army Corps of Engineers to Fund York Harbor, Saco River Dredging Projects", "2016-10-19", "2016", "2016-10", "Democrat", "House", "ME", "Chellie Pingree", "P000597", "pingree.house.gov", null, null, "legacy", "WASHINGTON, D.C. \u2013 Today, U.S. Senators Susan Collins and Angus King and U.S. Representative Chellie Pingree sent a letter urging the U.S. Army Corps of Engineers to move forward and fund critical dredging projects for York Harbor and the Saco River.  \n\t\u00a0  \n\t\u201cSmall ports and harbors like York and Saco River are the economic lifeblood for many coastal communities in Maine. \u00a0In allocating funds that Congress makes available to the Corps each year for the operation and maintenance of our nation\u2019s water infrastructure, the law requires the Corps to consider factors other than tonnage transiting through a harbor, to include potential for regional or local economic development. \u00a0In this respect, commercial activity on the Saco River\u2014home to more than 40 commercial fishing vessels\u2014contributes more than $53 million in economic impact to the community each year, and York Harbor produces a direct economic benefit of $12 million annually,\u201d said Senators Collins and King and Representative Pingree in the letter. \u201cTo address these critical needs and maintain our essential water infrastructure, we urge you to prioritize funding in this fiscal year the maintenance dredging of both the York Harbor and Saco River FNPs, consistent with all applicable laws and regulations.\u201d\u00a0  \n\t\u00a0  \n\tThe joint letter was sent to Assistant Secretary of the Army for Civil Works Jo-Ellen Darcy. Assistant Secretary Darcy supervises the U.S Army Corps of Engineers\u2019 Civil Works program, which is responsible for dredging to maintain channel depths in U.S. harbors and inland waterways.  \n\t\u00a0  \n\tFull text of the letter is below  \n\t\u00a0  \n\t+++  \n\t\u00a0  \n\tThe Honorable Jo-Ellen Darcy  \n\tAssistant Secretary of the Army for Civil Works  \n\tU.S. Department of Defense  \n\t108 Army Pentagon, Room 3E446  \n\tWashington, DC 20310-0108  \n\t\u00a0  \n\tDear Assistant Secretary Darcy:  \n\t\u00a0  \n\tWe are writing in support of the urgent need for maintenance dredging of the York Harbor Federal Navigation Project (FNP) in York, Maine, and the Saco River FNP in Saco and Biddeford, Maine, to address significant safety and navigational access concerns in the region. \u00a0  \n\t\u00a0  \n\tYork Harbor was last dredged in 1996. \u00a0The 42,000 cubic yards of sand, silt, and clay that have accumulated since then need to be removed. \u00a0Nearly two years ago, the New England District of the Army Corps of Engineers stated that significant shoaling in the harbor is \u201chindering navigational access and compromising vessel safety,\u201d and that inaction \u201cwould allow existing conditions to remain and worsen as shoaling continues.\u201d \u00a0The Town of York has secured all the necessary permits to remove this material, and the project has been \u201cshovel-ready\u201d for more than a year. \u00a0According to the New England District, York would most likely need to reapply for these permits and bear the significant financial costs of that process all over again if the project is not funded this fiscal year. \u00a0The project is estimated to cost between $2 and $3 million, but the Corps has not yet funded it despite the significant funding provided by Congress in recent years to maintain small harbors like York and Saco River.\u00a0\u00a0\nRecently, the towns of Saco and Biddeford similarly completed the permit process necessary for the Saco River dredging project, which is estimated to cost approximately $3.2 million. This FNP was last dredged in 1993. \u00a0More than 150,000 cubic yards of sand have accumulated since then and need to be removed. \u00a0Significantly, nearby Camp Ellis Beach is in dire need of clean sand to alleviate on-going erosion. \u00a0To date, 37 homes have reportedly been lost due to this erosion. \u00a0The sooner the Corps funds the Saco River project, the sooner that Camp Ellis Beach can be replenished with material dredged from the Saco River.\u00a0  \n\t\u00a0  \n\tSmall ports and harbors like York and Saco River are the economic lifeblood for many coastal communities in Maine. \u00a0In allocating funds that Congress makes available to the Corps each year for the operation and maintenance of our nation\u2019s water infrastructure, the law requires the Corps to consider factors other than tonnage transiting through a harbor, to include potential for regional or local economic development. \u00a0In this respect, commercial activity on the Saco River\u2014home to more than 40 commercial fishing vessels\u2014contributes more than $53 million in economic impact to the community each year, and York Harbor produces a direct economic benefit of $12 million annually.\u00a0  \n\t\u00a0  \n\tTo address these critical needs and maintain our essential water infrastructure, we urge you to prioritize funding in this fiscal year the maintenance dredging of both the York Harbor and Saco River FNPs, consistent with all applicable laws and regulations. \u00a0Thank you for your time and consideration.", 1, "2026-03-30T12:14:52Z", "2026-03-30T12:14:52Z"]], "columns": ["url", "title", "date", "year", "month", "party", "chamber", "state", "member_name", "bioguide_id", "domain", "scraper", "source", "date_source", "text", "has_text", "collected_at", "updated_at"], "primary_keys": ["url"], "primary_key_values": ["https://pingree.house.gov/media-center/press-releases/collins-king-pingree-call-army-corps-engineers-fund-york-harbor-saco"], "units": {}, "query_ms": 1.2845969758927822, "source": "dwillis/congress-press", "source_url": "https://github.com/dwillis/congress-press", "license": "MIT", "license_url": "https://github.com/dwillis/congress-press/blob/main/LICENSE"}