{"database": "press", "table": "releases", "rows": [["https://www.heinrich.senate.gov/newsroom/in-the-news/vox-how-the-biggest-renewable-energy-project-in-us-history-finally-got-built", "Vox: How the biggest renewable energy project in US history finally got built", "2026-10-22", "2026", "2026-10", "Democrat", "Senate", "NM", "Martin Heinrich", "H001046", "www.heinrich.senate.gov", "heinrich", "https://www.heinrich.senate.gov/newsroom/press-releases", "scraper", "When the sun goes down, the wind picks up in central New Mexico, whipping through arid canyons with a ghostly howl that for centuries, locals have likened to the wails of the folkloric ghost La Llorona.\n\nA few hours east of Albuquerque, this June, those gusts began powering the largest wind farm this continent has ever seen, twirling over 900 colossal steel turbines. Each is as tall as the Statue of Liberty, scattered across a patch of desert roughly the size of Chicago. They plug into a 550-mile transmission line stitched across the Southwest and are now powering over one million homes \u2014 as far away as California.\n\nThe SunZia Wind and Transmission project is a rare 21st-century triumph of American infrastructure, an engineering marvel that generates more electricity than the Hoover Dam. When the turbines came online this spring, they immediately broke records for wind-generated power in California\u2019s energy supply, where solar power may rule the day, but the winds of New Mexico increasingly fuel the night.\n\nAfter years of stagnant power growth, the US is absolutely starving for more electricity, with demand projected to rise by 25 percent by the end of this decade, and a staggering 78 percent by 2050. Enormous as this challenge might seem, it may ultimately be the catalyst the country needs to dramatically dial up its renewable energy infrastructure, so that the years to come are powered not by gas or coal, but by clean energy sources like the sun and the wind. By next summer, the project will have prevented about 9 million metric tons of carbon dioxide from entering the atmosphere, according to Pattern Energy, the project\u2019s developer.\n\nFor decades, however, it seemed the project would remain little more than a spectral dream.\n\n\u201cIt works!\u201d This was the call Hunter Armistead, Pattern\u2019s CEO, remembers getting from his head engineer when the turbines came online for the very first time. \u201cWe were creating power, and it was showing up 550 miles away in Phoenix, almost as if it was magic.\u201d During the ribbon-cutting for the wind farm, some construction workers showed off massive new turbine tattoos. \u201cIt\u2019s their pride that for the rest of their lives, they can drive by and tell their kid, \u2018I did this,\u2019\u201d Armistead said.\n\nBut SunZia almost didn\u2019t get built at all. It is not just the project\u2019s scale that makes it remarkable, but the utter morass its developers slogged through to bring it online. The project spanned five presidential administrations, an ownership change, a major reroute, and a standoff with a US military base.\n\nIt also involved a series of lawsuits from local tribal communities and environmental advocates, some of which remain pending even as the turbines now finally whirl. Building any renewable megaproject requires vast amounts of space, and hyperspecific natural conditions, like a wind that blows at night or a reliably sun-soaked desert plain. Then getting that energy to major cities means traversing some of the most pristine, spectacular natural corridors this nation has left, and particularly in the Southwest, rubbing up against the sacred lands of local tribal communities.\n\nThe decades-long saga to settle some of these tensions has turned SunZia into a helpful lesson, and for many, deserved or not, it became the ultimate poster child for permitting reform. And for many years, the country\u2019s need for power didn\u2019t seem to call for such a wildly ambitious project anyway. But in the interim, as the world changed, SunZia changed too, becoming \u2014 at least in some places \u2014 a better and more collaborative project than it was when it began. And now, with a nation finally focused on building more clean energy megaprojects, it can offer a glimpse of what\u2019s to come, even a blueprint of what could be.\n\nWhen SunZia was first proposed in 2006, the same year Twitter went online, coal was still the most important electricity source in America, and the nation\u2019s appetite for electricity had remained nearly flat year after year.\n\nAnd for the next 17 years, SunZia flailed, never even breaking ground. It ping-ponged between financial and regulatory purgatories that most commentators have attributed to endless permitting delays. There were, for example, a few state-level permitting debacles, with New Mexico rejecting SunZia\u2019s initial transmission route in 2018. Even after such interstate power lines get federal approval, they often need to wait years longer for approvals from every state in which their project passes.\n\nSen. Martin Heinrich of New Mexico, for one, has cited SunZia as a key impetus for his co-sponsoring the Senate\u2019s new plan for permitting reform. This would make it easier for the federal government to coordinate approval processes for interstate transmission lines, ensuring that they happen concurrently and preventing one state from dragging its heels.\n\nThe project had faced one particularly large and sticky permitting challenge: getting the power through the White Sands Missile Range. But this, and other challenges, were eventually resolved relatively quickly. And to David Hayes, who served as deputy secretary of the Department of the Interior during the Obama administration, this suggests that financing hamstrung the project even more than red tape.\n\n\u201cThe facts are the facts, and they got their permit,\u201d said Hayes \u2014 all the way back in 2015, not long after the Obama administration put SunZia on a \u201cfast-track\u201d to approval. \u201cSo we finally got the permit done. Hooray, right? And then nothing happens. Nothing happens.\u201d\n\nPart of that was the fact that the two states where SunZia wanted to build its transmission lines were not entirely on board. But it was also the sheer expense involved in building the project, especially given that the federal approval required burying parts of the transmission line near the missile range. Moreover, even if everything went perfectly with the project\u2019s permitting process, it might have been impossible to build SunZia back then, said Armistead, because \u201cwe really didn\u2019t have the market need for it.\u201d\n\nThe US simply wasn\u2019t as ravenous for new electricity as it is right now, and the importance of building out the future of energy was not enticing enough for investors on its own.\n\nBut, refusing to die a slow death of a thousand permitting blockades or financial setbacks, SunZia instead evolved. Pattern Energy, initially only in charge of developing the wind farm portion of the project, took over the transmission line project in 2022. Around that time, SunZia applied for a revised federal permit, one that would circumvent the missile range, and within less than two years \u2014 a relative sprint for federal bureaucracy \u2014 they had a new approval in hand. Then came $11 billion in financing from several global financial institutions, pension funds, and clean energy investors. Then, a few years of construction time later, the Americas\u2019 biggest wind farm was finally switched on.\n\nAnd more massive projects like this will be needed because nowadays, \u201cthere is no longer the excuse\u201d of a market unready for high volumes of clean energy, Armistead told me. \u201cIt is game time, and we\u2019re supposed to get this done.\u201d\n\nOne of the secrets to SunZia\u2019s ultimate success in New Mexico was the project\u2019s ability to strike compromises, even with some of its earliest critics. In some cases, a bunch of birds.\n\nRight about now, the earliest migratory birds, like the crimson-capped sandhill crane, have begun arriving at their Southwestern wintering grounds, not far from some of SunZia\u2019s newly operational high-voltage transmission lines.\n\nThis crane had nearly gone extinct before, driven in part by an explosion of new hydroelectric dams in the early 20th century, whose construction dried out local wetlands. SunZia\u2019s initial route, which was planned across one of the most congested flyways in the country, threatened them again, birders feared, alongside other migratory species who might accidentally fly into the new power lines, a threat believed to kill millions of birds nationwide each year.\n\nWhile SunZia\u2019s original developer, the Southwestern Power Group, was largely unmoved by those concerns, said Sarah Rose, vice president of climate at the National Audubon Society, the nonprofit found an unusually receptive partner to compromise when Pattern Energy took over.\n\n\u201cThey took their role as a project developer really seriously,\u201d she said, \u201cand I think they engaged with us with a lot of integrity and a lot of good faith.\u201d Under a rerouting plan, original power lines were moved north, erected next to existing infrastructure, or affixed with visual warning systems or bird diverters. Not only did the changes make the bird advocates happy, but they were enough to help convince the New Mexico Public Regulation Commission, which had rejected SunZia\u2019s permit application a few years earlier in part due to these concerns, to unanimously approve the project in 2022.\n\nTo be clear, not everybody believed Pattern always made the appropriate compromises, especially in Arizona, where SunZia\u2019s route remained unchanged under the new management. Peter Else, a local environmentalist, has spent years fighting SunZia in court over its intrusion into the scenic San Pedro Valley, a region that is sacred to Indigenous communities such as the Tohono O\u2019odham Nation and San Carlos Apache Tribe. To see it marred by more power lines through the landscape has been like \u201cmourning a death,\u201d Else said, \u201clike an ecological homicide.\u201d\n\nHe would have liked to see SunZia try to run the valley\u2019s new power lines alongside existing ones, as it managed to do in parts of New Mexico, a process that Armistead told me would not have been possible because the Arizona portion of the line \u201cwas already put to bed,\u201d and the original federal permit had found the valley to be \u201cthe least impactful and best route.\u201d A lawsuit from the Tohono O\u2019odham Nation and San Carlos Apache Tribe accusing SunZia and the Department of the Interior of failing to protect the valley remains pending.\n\nOf course, climate change threatens many of these regions more than a single power line. In the two decades it took SunZia to begin pumping clean energy across state lines, waves of extreme heat have taken tens of thousands of American lives, and the entire Southwest has continued in a megadrought unseen in the past 1,200 years.\n\nThese are some of the very concerns that SunZia seeks, in part, to combat. And if we want to avoid even more heat deaths, extreme droughts, more flash floods, and more habitat destruction, then we probably will need a lot more facilities like it, some of which will require hard tradeoffs.\n\nBut they aren\u2019t doomed always to. It may have taken SunZia over a decade to learn that lesson, but for future megaprojects, the blueprint may already be there. The nearby 280-mile high-voltage Southline Transmission Project spanning parts of Arizona and New Mexico is set to begin construction next year, and it\u2019s been so intentional about minimizing its ecological and cultural impact that even Else praised it as a good idea. And this approach could pave the way for even more essential large-scale projects like it. \u201cIf more folks could come to the table looking for solutions as opposed to expecting conflict,\u201d Rose said, \u201cI think we would be able to move a lot more quickly.\u201d Ideally, it won\u2019t take another 20 years.", 1, "2026-11-09T13:36:59Z", "2026-11-09T13:37:55Z"]], "columns": ["url", "title", "date", "year", "month", "party", "chamber", "state", "member_name", "bioguide_id", "domain", "scraper", "source", "date_source", "text", "has_text", "collected_at", "updated_at"], "primary_keys": ["url"], "primary_key_values": ["https://www.heinrich.senate.gov/newsroom/in-the-news/vox-how-the-biggest-renewable-energy-project-in-us-history-finally-got-built"], "units": {}, "query_ms": 0.7860248442739248, "source": "dwillis/congress-press", "source_url": "https://github.com/dwillis/congress-press", "license": "MIT", "license_url": "https://github.com/dwillis/congress-press/blob/main/LICENSE"}